Another hard setback for renewables in Extremadura. After five years of waiting, today it was published in the BOE that the great photovoltaic project, which first planned an installation of 394.1 megawatts of power over a total of 562.5 hectares, has been reduced to 170.1 megawatts of power over 242.8 hectares. Leaving the megaproject with a final installation of 224 megawatts over 319.7 hectares.